What to Expect

First Visit
Our Estimator and/or Designer talks with you and discusses your needs, preferences, likes & dislikes, layout and more. They measure the space and often create a sketch of the idea. After the meeting is over, the measurements and information are carefully reviewed and a proposal is made, then sent to you via email, mail or hand-delivered.

Second Visit
At this time, any questions are answered, and changes to the contract are made. When you are ready to approve the proposal, a 10% deposit is made and design renderings begin.

Third Visit
The renderings are emailed for review prior to this meeting. We then go over the details and make any necessary changes. Often at this time, we can look through different options to add to the design via moldings and corbels, or functional pieces that work inside of the cabinets. If the changes are lengthy, we will make them during a later time and send them to you. Once the renderings are ready to approve, a 40% deposit is due to prepare and manufacture the cabinets.

We take it from here...
The cabinets can take between 4-5 weeks to manufacture. Since we make them here, everything is done in Rancho Cucamonga, California and cut from parts ordered from local lumber suppliers. Once the cabinetry is built, stained and finished, we then ask for the next 40% deposit at delivery.

Delivery and Installation can begin on the same day. The installation can take anywhere from 2-days to a week or two depending on the size. Our granite fabricators come in once we set the bases, so this decreases the time you'll be out of your kitchen.

We also can handle the tear-out and haulaway of your existing cabinetry. If they're able to be removed in one piece, we recommend donating them to a local charity, or the Habitat for Humanity.